Building a swimming pool yourself may seem simple enough. But before you start, it is essential to think carefully about your construction project. You have to think through its entire design (location, chosen coating, structure, etc.) and this down to the smallest detail. This is very important for the efficiency, durability and quality of your pool. Find out in this article how to prepare for the installation of a swimming pool by yourself.
Install a swimming pool by yourself: the main stages of the project
The density of construction work for a swimming pool generally depends on the type of swimming pool you have chosen. The shape, size and the necessary materials that should be used for your pool are also to be taken into account. All these elements play not only on the duration of construction, but also on the price.
It is important to stress that a swimming pool must necessarily meet a certain required standard, especially in terms of safety. So in developing your pool budget, the necessary elements such as safety devices, water treatment products must be included.
Since the purchase of a swimming pool represents a large investment, it will be better to opt for a pool kit (above ground, semi-buried or buried). These pools offer certain ease of assembly, which allows you to install them yourself and quickly. You will still need professional help with a few settings. However, when it comes to a ready-to-dive pool, it is best to hire a pool builder.
Also remember to choose your pool manufacturer. This requires that you inquire about the guarantees offered by the latter, the after-sales service, etc. In addition, obtaining a building permit is necessary if the pool exceeds 20 m².
Plan the installation of your pool
The installation of a swimming pool must answer this question, namely:
When
Indeed, the ideal period to build a swimming pool is winter. So when the work happens to be late, it will not impact your programs. Spring can be used to set up your pool, before jumping into the water as soon as summer arrives.
Where
When it comes to the location of your pool, it should be chosen wisely. Your pool should be in the sun, more precisely sheltered from the wind and not too close to trees. So you can take advantage of the summer heat as needed.
The duration
If it is a traditional inground pool, a maximum of a fortnight should be allowed for the work to be carried out. This time can of course be extended when you plan to build your pool by yourself. And for good reason, the laying of the beach or the construction of a technical room takes enough time.
The different stages of construction
Among inground pools, the masonry pool is the most popular. Indeed, a concrete swimming pool also offers great freedom. You have the possibility to define the most amazing shapes for your swimming pool.
The construction of a concrete swimming pool takes place according to these main stages:
- site preparation, which involves laying out and earthworks
- the installation of the structure
- Laying of the coating
- Finishing, this is the electrical connection.
But it would be wise to hire a professional to benefit from this advice.